- Contact Us
- Resources
- Products
- Profile
- Home
home > case studies > St. Angela's Sewage Treatment Plant
Address: St. Angela's College, Co. Sligo
Client: St. Angela's College/ Dept. Of Education
Engineer/Client Contact Details: Jennings O'Donovan & Partners, Finisklin, Sligo
David Kiely, Ph: 071 9161416 0
Completion Date: November 2000
Population Equivalent: 250 P.E.
Value: € 127,000 + vat
BMS Design Details: Design, supply, install (inc. Civil works to plant), commission BMS BL 3000 Blivet Unit c/w Grease Traps, pumping station, ferric dosing, flow measurement, sampling, new power supply, alterations to existing works, full m & e fit out of site and control house inc. Stand by generator, dial out alarm, open grid flooring, tools & equipment.
BMS Construction/Installation Details: BMS was responsible for all civil works associated with the installation of the treatment plant, site ducting, pipework, valves and lighting.
BMS Operation/Maintenance Details: A one year service & maintenance contract was included with the original contract. Subsequently the client has renewed this contract, which includes all mechanical maintenance and sampling.
Comments: The BMS system was installed in a very scenic area and has blended into the landscape unobtrusively.